Acquisition Information: The CALIPSO satellite performed an extended polarization calibration on November 22-25, 2016. The payload was down from November 22, 2016 at 15:29:38 to November 25, 2016 at 15:12:33 UTC.
Production Information: There are no EXPEDITED Lidar Level 1 products for the granule, 2016-11-22T15:00:00 UTC.