FIRE Cirrus IFO Phase II CSU PRT-6 Data Parsons KG&E Power Plant Parsons, Kansas Information on instrumentation and the data can be found in the corresponding CSU blue book on the Parsons site. The PRT-6 was not run in a continueous mode. Data was collected during the period from 18 Nov 1991 (day 322) to 7 Dec 1991 (day 341). When operating, data was sampled every 5 seconds. The site was at 37 deg 18 min N and 95 deg 07 min W. FILES: There are 15 data files in ParPRT6.tar.Z. They are named mmmdd.prt6 where mmm is the month (nov or dec), and dd is the day (UTC) when the data were colleted. FORMAT: Free Format VARIABLES: 4 variables (in order) julian day (UTC) hour-minute (UTC) second (UTC) equivalent brightness temperature (K) WARNING: There are temporal gaps in the data. REFERENCE: Cox, S., G. Beck, C. Cornwall, J. Davis, P. Hein, C. Lappen, R. Song, J. Withrow, and D. Wood, 1992: "CSU FIRE II Cirrus Field Experiment: Description of Field Deployment Phase." Atmospheric Science Report #506, 79pp.